PT Danantara Investment Management (DIM) and PT Daya Energi Bersih Nusantara (Denera) have selected partners to develop and manage the second phase of such facility.
The eight partners and the location of their projects are:
- SUEZ-IAN Consortium (SUEZ Insan Asia) in Medan Raya
- Consortium Everbright Cemerlang Energy (Everbright Harmoni) in Kabupaten Bekasi
- Bumi Biru Indonesia (SUS Indoplas) in Lampung Raya
- Masa Depan Energi Indonesia (Chandra Waste Energy BGE) in Serang Raya
- Veolia Environmental Services Asia Pte. Ltd. in Semarang Raya
- Consortium Mentari Citra Lestari (Bakrie Power SUS) in Surabaya Raya
- MPM-CEVIA Consortium (Mega Power CEVIA) in Bogor Raya 2
- Cakra Energi Lestari Consortium (Pertamina NRE Tianjin CITICC) in Yogyakarta Raya
Previously, Danantara picked Wangneng Environment Co., Ltd. to operate a waste-to-energy facility in Bekasi, West Java, and Zhejiang Weiming Environment Protection Co., Ltd. to operate a plant in Denpasar, Bali.
Statement by Danantara Indonesia can be accessed here.
News published by CNBC and Kontan about the eight partners can be accessed in full through the links.