| No. | Project | Location | Description | Project Owner | Date Start | Status | Target Completion | Source |
| 1 | PLTSa Benowo | Surabaya, East Java | Waste-to-energy facilities at Benowo landfill. The project includes landfill-gas power generation and a thermal gasification-based plant; total reported capacity is around 10.65 MW (1.65 MW landfill gas plus 9 MW gasification). | Surabaya City Government owns/controls the landfill asset. PT Sumber Organik is the independent power producer/operator under a 20-year landfill-management concession; PLN is the power offtaker. | PT Sumber Organik’s concession began in October 2012; landfill-gas generation began November 2015. | Operating. Landfill-gas facility has operated since November 2015; the 9 MW gasification facility was inaugurated in May 2021. | Already operating. PLN stated its cooperation with PT Sumber Organik runs through 2032. | PLN |
| 2 | PLTSa Putri Cempo | Surakarta, Central Java | Waste-to-energy plant at Putri Cempo final disposal site. Reported design: processing about 545 tonnes/day of waste and producing 8 MW, of which 5 MW is supplied to PLN. | Public partner: Surakarta City Government. Project operator/developer: PT Solo Citra Metro Plasma Power (SCMPP). | Project development dates vary by source; the municipal cooperation framework predates commissioning. The operational project reached COD/operation in October 2023. | Operating. The city government confirms formal operation since October 2023. However, separate reporting in 2025 indicated actual waste throughput was still materially below the 545-tonne/day design capacity. | Commercial operation commenced 30 October 2023. Earlier municipal planning had targeted COD for December 2022, which was delayed. | The Surakarta City Government |
| 3 | PSEL Denpasar Raya | Pedungan, South Denpasar, Bali | A moving-grate waste-to-energy plant for Greater Denpasar, intended to process municipal waste and generate electricity. | National project sponsors: PT Danantara Investment Management (DIM) and PT Daya Energi Bersih Nusantara (Denera). Project Development and Operating Company/BUPP: Nusantara Bali New Energy; the selected international operator/developer is Zhejiang Weiming Environment Protection. | 8 July 2026 | Construction launched / implementation stage. This was the first Danantara PSEL location to hold an inauguration/groundbreaking. | First half of 2028 is the official target commercial operation date. | Danantara Indonesia |
| 4 | PSEL Kota Bekasi | Bekasi City, West Java | Waste-to-energy project intended to process up to 1,500 tonnes of municipal waste per day into electricity. | DIM and Denera lead the investment programme. The selected consortium is Wangneng Adyawinsa Energi Consortium, led by Wangneng Environment; the project SPV/BUPP has been reported as PT Wangneng Bekasi Environment Nusantara. | 26 August 2026 | Construction started. It is one of the initial Danantara WtE projects and has national strategic-project status. | Reported target: mid-2028. | CNINFO |
| 5 | PSEL Bogor Raya | Greater Bogor, West Java | Regional waste-to-energy project for Bogor-area municipal waste. Earlier public descriptions indicate a planned capacity of approximately 1,500 tonnes/day. | DIM and Denera are national programme sponsors. Selected developer/operator: Zhejiang Weiming Environment Protection. Project company reported as PT Weiming Nusantara Bogor New Energy. | Partner selection announced 13 March 2026; regional project cooperation was reported in April 2026. Recent news report said ground breaking to be held in September 17, 2026. | Pre-construction / project implementation preparation. Partner selection and intergovernmental cooperation have been announced; an independently verified construction start date was not available in the reviewed official material. | No official, project-specific COD target was located in the reviewed sources. Treat prior references to 2027 start-up as indicative only, pending financing and construction confirmation. | Antaranews |
| 6 | PSEL / PLTSa Legok Nangka | Bandung Regency, West Java | Regional waste-to-energy project serving six areas: Bandung City, Bandung Regency, West Bandung, Cimahi, Sumedang, and Garut. Planned capacity: 40.79 MW, with roughly 2,000 tonnes/day of waste processing. | Provincial public sponsor: West Java Provincial Government. Implementing project company: PT Jabar Environmental Solutions (JES). Earlier project documentation identifies a Sumitomo–Hitachi Zosen consortium as technology/development partner. PLN is the electricity offtaker. | 29 July 2026 | Under construction. Groundbreaking occurred in July 2026; PLN had signed a power-purchase agreement with JES in March 2026. | End-2029 target operation; reported construction duration is about 41 months. | Detik |
| 7 | PSEL Medan Raya | North Sumatra | Batch-II regional waste-to-energy project under Danantara’s national PSEL programme. | Programme sponsors: DIM and Denera. Selected partner: Nusantara Energi Hijau Consortium / BGE Sentosa Utama. | Selected partner announced 13 July 2026; CLoA awarded 21 July 2026. | Conditional Letter of Award (CLoA); feasibility study and project preparation. Not yet at financial close or construction based on available sources. | No project-specific COD disclosed. Batch-II groundbreaking target: December 2026–January 2027. | Danantara Indonesia |
| 8 | PSEL Kabupaten Bekasi | West Java | A separate Batch-II project for Bekasi Regency; it should not be conflated with the City of Bekasi/Bantar Gebang project. | DIM and Denera. Selected partner: Everbright Cemerlang Energy Consortium / Everbright Harmoni. | Selected partner announced 13 July 2026; CLoA awarded 21 July 2026. | CLoA; feasibility-study and pre-construction preparation. | No project-specific COD disclosed. Batch-II groundbreaking target: December 2026–January 2027. | Danantara Indonesia |
| 9 | PSEL Lampung Raya | Lampung | Batch-II regional waste-to-energy project. | DIM and Denera. Selected partner: Bumi Biru Indonesia Consortium, involving SUS Indonesia Holding and PT Indoplas Dewata Energi. | Selected partner announced 13 July 2026; CLoA awarded 21 July 2026. | CLoA; feasibility-study and pre-construction preparation. | No project-specific COD disclosed. Batch-II groundbreaking target: December 2026–January 2027. | Danantara Indonesia |
| 10 | PSEL Serang Raya | Banten | Batch-II regional waste-to-energy project. | DIM and Denera. Selected partner: Masa Depan Energi Indonesia Consortium, reported to involve Chandra Waste Energy and BGE. | Selected partner announced 13 July 2026; CLoA awarded 21 July 2026. | CLoA; feasibility-study and pre-construction preparation. | No project-specific COD disclosed. Batch-II groundbreaking target: December 2026–January 2027. | Danantara Indonesia |
| 11 | PSEL Semarang Raya | Central Java | New Batch-II regional WtE project. It is distinct from the earlier Jatibarang landfill-gas/PLTSa arrangement, whose operating period has ended. | DIM and Denera. Selected partner: Veolia Environmental Services Asia Pte. Ltd. | Selected partner announced 13 July 2026; CLoA awarded 21 July 2026. | CLoA; feasibility-study and pre-construction preparation. | No project-specific COD disclosed. Batch-II groundbreaking target: December 2026–January 2027. | Danantara Indonesia |
| 12 | PSEL Surabaya Raya | East Java | Batch-II regional PSEL project, separate from operational PLTSa Benowo. | DIM and Denera. Selected partner: Mentari Citra Lestari Consortium, reported to include Bakrie Power and SUS Indonesia. | Selected partner announced 13 July 2026; CLoA awarded 21 July 2026. | CLoA; feasibility-study and pre-construction preparation. | No project-specific COD disclosed. Batch-II groundbreaking target: December 2026–January 2027. | Danantara Indonesia |
| 13 | PSEL Bogor Raya 2 | West Java | A second, separately procured Bogor-area project in Batch II; distinct from the initial Bogor Raya project awarded to Weiming. | DIM and Denera. Selected partner: MPM–CEVIA Consortium / Mega Power CEVIA. | Selected partner announced 13 July 2026; CLoA awarded 21 July 2026. | CLoA; feasibility-study and pre-construction preparation. | No project-specific COD disclosed. Batch-II groundbreaking target: December 2026–January 2027. | Danantara Indonesia |
| 14 | PSEL Yogyakarta Raya | Special Region of Yogyakarta | Regional WtE project serving the Yogyakarta urban area and participating local governments, including Yogyakarta City, Bantul, and Sleman. | DIM and Denera. Selected partner: Cakra Energi Lestari Consortium, reported to involve Pertamina Power Indonesia, Tianjin TEDA Environmental Protection, and CITICC International Investment. | Selected partner announced 13 July 2026; CLoA awarded 21 July 2026. | Pre-construction. Partner has received CLoA; Danantara later indicated that groundbreaking was targeted for December 2026. | Groundbreaking targeted for December 2026. No public project-specific COD date was located. | Antaranews |